Thursday, October 2, 2008

Basement Floor




This was really cool. The first picture here is gravel being shot into the spaces where it is needed. Once the walls were up to the first floor level, Ben poured gravel into building space, smoothed it and then made trenches for pipe work. The third picture the plumber laid out pipe, then insulation followed and more rebar, and the pipes for the underfloor heating and then cement got poured over all of it.